Reason inactive this Campaign is not provided by %s Team

Image
Image
Protect, restore and promote sustainable use of terrestrial ecosystems, sustainably manage forests, combat desertification, and halt and reverse land degradation and halt biodiversity loss
Image
Species protection
Image
Savannas

Created by, Flavia Cantal

The second chance Project (ASAS para a Liberdade)

1% Complete (success)
USD 3.50 Raised Of USD 10,129.39 Goal
1%
Fixed
2 Funders
End Date:

Organization Name: Instituto Pouso Alto

Strategic Partner: Project Not Assign

Organization Information

Organization Name
Friends of the Forests Association
Organization Category
Civil Society Organization
URL
https://www.institutopousoalto.org.br/
Organization Location
quadra 13, conjunto G lote 14, Sobradinho-DF CEP 73040-137
Description

The Association of Friends of the Forests works to protect the Cerrado, its flora and fauna, with a focus on the Sobradinho and Veadeiros regions of Goiás.

Project Story

Tell us more about the challenge of the project.What is the problem you are trying to solve? Why is the problem significant?

The release of rehabilitated wild animals meets a demand from the government CETAS, which needs pristine areas for the release of animals that have the possibility of returning to the wild. On the other hand, many of the species rehabilitated are vulnerable or endangered species whose populations are in sharp decline. Thus, in addition to strengthening the population of that species in the release area, unjust damage caused to that individual is being repaired, and it will have a second chance to live fully in situ.

Some researchers and thinkers go further, saying that rewilding is the missing piece in restoration efforts, where conservation falls short by recovering practically empty forests or with key species that no longer inhabit that territory. The reintroduction of wolves to Yellowstone is perhaps the most famous example of how important and decisive the reintroduction of a species that was once persecuted, especially because it is "top of the chair", can have extremely beneficial effects on the biodiversity and resilience/strength of that ecosystem - see, by the way, the Ted Talk, For more wonder, rewild the world:


Tell us more about the proposed solution of the project.How will it work?

The WINGS Project at RPPN Avá-Canoeiro is a project that aims to structure a Release Center for Wild Animals that have been rehabilitated by CETAS or IBAMA Screening Centers. These are animals that have been victims of illegal trafficking, hit-and-run accidents, or various forms of aggression and which, after treatment ranging from one or two months to a few years, have obtained the ability to be reintroduced into their natural habitat because they can feed and care for themselves without the need for human help. Some animals will never be able to live in the wild and when their chances of surviving in the wild are minimal, due to sequelae or because the animals are too tame, for example, IBAMA does not authorize their release and they continue to live in captivity forever.

The Avá-Canoeiro RPPN team has already raised funds to build a 740m2 mammal enclosure and a 400m2 bird/psittacine enclosure. At the moment, we are also buying an electrified fence for the mammal enclosure to make it safe for the animals that will be there acclimatizing (to prevent jaguars from climbing out of the enclosure, for example) and also to receive animals that climb the screens - jaguars and anteaters.

It so happens that the animal caretaker who feeds and watches over the animals is sleeping in a makeshift tent, and it is important that better facilities are made available for him, as well as a pantry and fridge to store the animals' food.

We already have the architectural design for the caretaker's house, as well as an outpatient clinic (which we intend to build when we are ready, in two or three years, to upgrade from an ASAS to a CETAS, which would require hiring a veterinarian and assistant to carry out rehabilitation and less complex surgeries that the animals need, thus relieving the IBAMA CETAS, which are currently overflowing with animals).

The architectural plans were kindly donated by Simbiose Arquitetura/Architect Bruno Ferreira.

Last week, we released a male-maned wolf and are about to receive a pair of tapirs and another female-maned wolf.


What will be the main activities of the project and how will the resources be applied?

The project's main activity is to receive healthy animals from the CETAS in Goiânia and Brasília, which will have to complete a variable period of rehabilitation and acclimatization in enclosures before being released. During this period, the animals must be adequately fed, watched, and monitored later, after release, using a GPS or VHF collar. The monitoring is done with the support of CETAS/Instituto Floresta Cheia/Time de Conservação dos Mamíferos da Chapada dos Veadeiros/UNB. The region surrounding the ASAS of the Avá-Canoeiro RPPN is considered excellent for receiving rehabilitated individuals due to the excellent state of conservation of its surroundings, its proximity to the Chapada dos Veadeiros National Park and its high support capacity, as well as the fact that it is a very sparsely inhabited region.

The funds will be used exclusively to build a small residence for a caretaker, with a pantry and fridge to store food for the animals. The caretaker's house will be 40m2 and built with accessible materials such as eucalyptus/adobe bricks/clay or American tiles, among other materials.

Action Location

Cavalcante,GO

Sr. NO Category Name Item Name Quantity Amount Core Expense Actual Expense Difference Amount Documents
1 Works and Construction SIKA 1 Balde 18L 1.00 USD 23.08 USD 23.08 USD 0.00 USD 0.00 Not Available
2 Works and Construction Wooden lining 200MM X 8MM X 5M 40.00 USD 4.20 USD 167.86 USD 0.00 USD 0.00 Not Available
3 Works and Construction Prego 17 X 27 1KG 5.00 USD 3.15 USD 15.74 USD 0.00 USD 0.00 Not Available
4 Works and Construction Prego 19 X 36 1KG 1.00 USD 3.15 USD 3.15 USD 0.00 USD 0.00 Not Available
5 Works and Construction Door 86 X 212 X 12MM 3.00 USD 192.33 USD 577.00 USD 0.00 USD 0.00 Not Available
6 Works and Construction Main Venetian window 1.2 X 1M 4.00 USD 119.60 USD 478.39 USD 0.00 USD 0.00 Not Available
7 Works and Construction Tilt-and-turn window with grille 60X40CM 1.00 USD 29.37 USD 29.37 USD 0.00 USD 0.00 Not Available
8 Works and Construction 100MM 6M sgoto tube 2.00 USD 13.64 USD 27.28 USD 0.00 USD 0.00 Not Available
9 Works and Construction Sewer Pipe Knee 100MM 90G 3.00 USD 0.17 USD 0.52 USD 0.00 USD 0.00 Not Available
10 Works and Construction 50MM 6M Sgot Pipe 2.00 USD 11.54 USD 23.08 USD 0.00 USD 0.00 Not Available
11 Works and Construction Sewer Pipe Knee 50MM 90G 6.00 USD 0.44 USD 2.62 USD 0.00 USD 0.00 Not Available
12 Works and Construction Weldable pipe 25MM 6M 5.00 USD 4.55 USD 22.73 USD 0.00 USD 0.00 Not Available
13 Works and Construction 25MM 90G weldable elbow 37.00 USD 0.52 USD 19.41 USD 0.00 USD 0.00 Not Available
14 Works and Construction PVC glue 175G 3.00 USD 2.10 USD 6.29 USD 0.00 USD 0.00 Not Available
15 Works and Construction Thread sealing tape 18MM X 50M 2.00 USD 1.57 USD 3.15 USD 0.00 USD 0.00 Not Available
16 Works and Construction Siphon box for 7 inlets 15 X 15CM 2.00 USD 6.29 USD 12.59 USD 0.00 USD 0.00 Not Available
17 Works and Construction 3-inlet siphon box 10 X 12CM 1.00 USD 2.62 USD 2.62 USD 0.00 USD 0.00 Not Available
18 Works and Construction DN100 grease trap 1.00 USD 67.14 USD 67.14 USD 0.00 USD 0.00 Not Available
19 Works and Construction 25MM Corrugated Hose 50.00 USD 0.52 USD 26.23 USD 0.00 USD 0.00 Not Available
20 Works and Construction Electricity Box 4 X 2CM 16.00 USD 0.26 USD 4.20 USD 0.00 USD 0.00 Not Available
21 Works and Construction American clay tile 730.00 USD 0.52 USD 382.92 USD 0.00 USD 0.00 Not Available
22 Works and Construction Bathroom Vase with 2 pieces 3,6L 1.00 USD 69.24 USD 69.24 USD 0.00 USD 0.00 Not Available
23 Works and Construction Washbasin 1.00 USD 33.57 USD 33.57 USD 0.00 USD 0.00 Not Available
24 Works and Construction Screws 12 2.00 USD 1.40 USD 2.80 USD 0.00 USD 0.00 Not Available
25 Works and Construction Siphon 2.00 USD 3.15 USD 6.29 USD 0.00 USD 0.00 Not Available
26 Works and Construction Galvanized metal 20 X 20 6.00 USD 5.25 USD 31.47 USD 0.00 USD 0.00 Not Available
27 Works and Construction Biodigestor 1.500L/dia 1.00 USD 454.61 USD 454.61 USD 0.00 USD 0.00 Not Available
28 Works and Construction Arame liso 250m 1.00 USD 38.82 USD 38.82 USD 0.00 USD 0.00 Not Available
29 Salaries and Labor Charges Labor 1.00 USD 4,546.09 USD 4,546.09 USD 0.00 USD 0.00 Not Available
30 Supplies Fretes 1.00 USD 1,573.65 USD 1,573.65 USD 0.00 USD 0.00 Not Available
31 Works and Construction Eucalyptus 3,5M X 10 To 12 4.00 USD 9.27 USD 37.07 USD 0.00 USD 0.00 Not Available
32 Works and Construction Eucalyptus 5.0M X 12 TO 14 4.00 USD 25.18 USD 100.71 USD 0.00 USD 0.00 Not Available
33 Works and Construction Eucalyptus Logs 7.0M X 08 To 10 12.00 USD 17.83 USD 214.02 USD 0.00 USD 0.00 Not Available
34 Works and Construction Metalon Coluna 20 X 20 24.00 USD 6.29 USD 151.07 USD 0.00 USD 0.00 Not Available
35 Works and Construction Steel column 5/16 8MM 8.00 USD 16.79 USD 134.28 USD 0.00 USD 0.00 Not Available
36 Works and Construction Fio 1KG 5.00 USD 3.15 USD 15.74 USD 0.00 USD 0.00 Not Available
37 Works and Construction Pine board 10.00 USD 7.34 USD 73.44 USD 0.00 USD 0.00 Not Available
38 Works and Construction Washed sand 10.00 USD 17.83 USD 178.35 USD 0.00 USD 0.00 Not Available
39 Works and Construction Eucalyptus Logs 3.2M X 12 TO 14 2.00 USD 12.59 USD 25.18 USD 0.00 USD 0.00 Not Available
40 Works and Construction Eucalyptus 5,0M X 10 A 12 1.00 USD 14.69 USD 14.69 USD 0.00 USD 0.00 Not Available
41 Works and Construction Eucalyptus Logs 6.0M X 12 TO 14 1.00 USD 28.33 USD 28.33 USD 0.00 USD 0.00 Not Available
42 Works and Construction Eucalyptus 2.2M X 10 To 12 1.00 USD 4.20 USD 4.20 USD 0.00 USD 0.00 Not Available
43 Works and Construction Eucalyptus 4,0M X 10 A 12 3.00 USD 12.59 USD 37.77 USD 0.00 USD 0.00 Not Available
44 Works and Construction Cement 50KG 60.00 USD 6.29 USD 377.68 USD 0.00 USD 0.00 Not Available
45 Works and Construction Brita 01 3.00 USD 28.33 USD 84.98 USD 0.00 USD 0.00 Not Available
Total Amount USD 10,129.39 USD 0.00

Unforeseen Expenditure

Sr. NO Category Name Item Name Quantity Amount Core Expense Actual Expense Difference Amount Documents
Total Amount USD 0.00
Image
Michael Becker
USD 1.75 15-04-2024
Image
Michael Becker
USD 1.75 15-04-2024

Então teremos mais migos ou colegas doando?

Post a Comment

  • There are no Comments for this Campaign.